Gas to electric conversions in Traralgon homes
Gas to electric conversion in Traralgon: the electrical work for heat pump hot water, induction and reverse cycle heating, and Victoria's 2027 rules.
Converting a Traralgon home from gas to electric means replacing gas hot water, heating and cooking with a heat pump water heater, reverse cycle air conditioning and an induction cooktop, and the electrician’s part is making sure the switchboard and circuits can carry the extra load. From 1 March 2027, a gas water heater in an existing Victorian home that reaches end of life and cannot be repaired must be replaced with an electric one. Existing gas cooktops and heaters can still be repaired or replaced with gas.

Independent licensed electricians who receive your enquiry through this site assess the board, quote the electrical work and carry it out. The plumbing and refrigeration parts of a conversion are done by licensed plumbers and air conditioning technicians.
What are Victoria’s 2027 gas and electric rules?
The Victorian Government’s electrification and efficiency standards page and AusNet’s summary of the new rules set out the dates.
| Rule | Starts | Who it affects | Instrument |
|---|---|---|---|
| New homes and most new commercial buildings must be all-electric | 1 January 2027 | Builders and buyers of new homes; a permit approved before 31 December 2026 may still allow a gas connection | Building Regulations 2018 |
| End-of-life gas water heater replaced with electric | 1 March 2027 | Owner-occupiers of existing homes; not apartment buildings with centralised hot water | Plumbing Regulations 2018 |
| Rental minimum efficiency standards | Phased in from 1 March 2027 | Rental providers and renters | Residential Tenancies Regulations 2021 |
The government page also says exemptions exist where electrification or the standards are impractical or too costly. Nothing in the existing-home rule forces you to remove a working gas cooktop or heater. AusNet confirms those appliances can keep being repaired, and replaced with gas models if you choose.
Rental homes have their own rules on failed hot water and heating; the rental electrical safety checklist sets out what landlords need to do.
Which appliances change, and what does each need electrically?
| Gas appliance | Usual electric replacement | Typical electrical work |
|---|---|---|
| Gas storage or instantaneous hot water | Heat pump hot water system | New or upgraded circuit and an isolator at the unit; ask whether a timer suits your tariff |
| Gas cooktop | Induction cooktop | Dedicated high-current circuit from the switchboard |
| Gas wall furnace or ducted heating | Reverse cycle split systems or ducted reverse cycle | One circuit per larger unit, plus outdoor isolators |
| Gas oven | Electric wall oven | Dedicated circuit, sometimes shared with the cooktop if sized for both |
| Gas log fire | Reverse cycle unit or electric heater | Circuit depends on the unit chosen |
The plumber disconnects and caps gas lines, and installs the heat pump tank and its water connections. A refrigeration technician installs the air conditioning units and pipework. The electrician runs the circuits, fits isolators and connects each appliance.
Will the switchboard cope?
That is the first question an electrician will answer. Swapping several gas appliances for electric ones adds a lot of load that the board was never set up for. Common findings:
- No spare positions for new circuit breakers.
- An old fuse board, or a board without safety switches on every circuit.
- A main switch or consumer mains that may need checking against the new total load.
- A single phase supply, which suits most homes, but with large ducted systems plus an EV charger the electrician may discuss whether three phase is worth asking the distributor about.
If the board needs replacing, the Melbourne guide range for a single phase switchboard upgrade is $945 to $2,950. The switchboard upgrades page covers that job. Switchboard and consumer mains work is prescribed work in Victoria, so an independent inspector checks it before it is turned on.
When you are ready to plan the circuits, you can ask for an all-electric conversion quote and list the appliances you are swapping.
Can the work be staged?
Yes, and most households do it that way. A practical order is:
- Get the switchboard assessed and, if needed, upgraded first, with spare capacity for what comes next.
- Replace hot water when the gas unit fails or before it does, since the 2027 rule bites at end of life.
- Add reverse cycle heating and cooling, which also covers hot summers.
- Swap the cooktop and oven during a kitchen renovation.
- Once nothing gas is left, talk to your gas retailer about the meter and supply charges.
Planning the circuits for all stages in step 1 avoids paying for a second board change later.
Are there discounts on the appliances?
Victorian Energy Upgrades offers discounts on efficient reverse cycle air conditioners and heat pump hot water systems, and every Victorian household is eligible, according to the Victorian Energy Upgrades household page. The discount is applied to the quote by an accredited provider, or by your own installer if they work with an accredited provider. You usually need to be replacing an older appliance with an approved model. Renters need landlord approval for some upgrades. Check the discount on the appliance quote itself; the electrical circuit work is a separate item.
What does it cost?
| Item | Melbourne guide range |
|---|---|
| Single phase switchboard upgrade, if needed | $945 to $2,950 |
| New power point, per point, for appliances that plug in | $160 to $315 |
These are Melbourne metro guide figures from October 2026, not Traralgon prices. Dedicated circuits for cooktops and heat pumps are quoted per circuit because cable length and breaker size vary. The appliances, plumbing and refrigeration work are priced by those trades.
What will a careful electrician check first?
Before quoting circuits, a careful electrician will:
- Add up the expected load of every new appliance, not only the first one being installed.
- Look at the main switch rating and the consumer mains as well as the spare breaker positions.
- Ask where the heat pump unit and air conditioner outdoor units will sit, since that sets the cable runs.
- Confirm the induction cooktop’s rated current from its installation manual before choosing the cable and breaker.
- Refuse to connect a new heavy load to a board with no safety switch protection.
Having the appliance model numbers ready at the first visit saves a second trip.
What should you know about power cuts?
Solar Victoria’s power outage guidance points out that an all-electric home is more affected by an outage than a dual-fuel home, because cooking, heating and hot water all stop at once. Backup options it lists are a solar battery set up for backup, or a generator. The power outage or electrical fault guide covers what to check when the power goes out. If backup matters to you, raise it with the electrician before the board is changed, so the circuits for essentials can be grouped.
Is Rosedale any different?
Rosedale sits in Wellington Shire rather than Latrobe City, but the 2027 rules are state-wide, so they apply the same way there. Owners in Rosedale with a farmhouse or a large shed can mention the outbuilding loads in the enquiry so the board is sized for them too.
Next step: what to include in a gas to electric enquiry
List every gas appliance in the house, its rough age and which ones you want to replace first. Add a photo of the switchboard with the cover closed and of the meter box, and say whether you know if the supply is single or three phase. Mention any solar panels or battery, and whether an EV charger is planned. Send it as a gas to electric enquiry with your suburb, and the electrician can plan the circuits for the whole conversion.
Frequently asked questions
- Do I have to remove my gas cooktop in 2027?
No. Under the rules starting in 2027, existing gas cooktops and heaters in an existing home can keep being used, repaired and even replaced with gas models. The end-of-life rule for existing homes applies to gas water heaters.
- What if my gas hot water fails before March 2027?
The replacement rule starts on 1 March 2027, so before then you can choose. Many owners plan an electric replacement anyway, since the circuit work and any switchboard change can be organised ahead of a failure rather than in a rush.
- Does a heat pump hot water system need a big electrical upgrade?
Often it needs only a dedicated circuit and an isolator, but that depends on the switchboard and what else is being added. If the board has no spare positions or lacks safety switches, the electrician may recommend board work first.
- Who applies the Victorian Energy Upgrades discount?
An accredited provider applies it to the quote for an approved product, or your installer does if they work through an accredited provider. The discount covers eligible appliances; the circuit work by an electrician is normally a separate item.
- Can solar panels help after going all-electric?
Solar can supply part of the daytime load, and heat pump hot water can be set to run during sunny hours. Unless the system has a battery with backup capability, it will usually switch off during a grid outage. Ask the solar installer how your system behaves.